Grading, Close but no Cigar

Hello Everyone,
The City of Edmonton got back to us about passing our grading inspection.
Unfortunately we still need to do more work to meet the city’s approval.

In total this additional work will cost the condo corporation approximately $22000 to complete.

The following work will need to be done:

Retaining wall behind units 42-47

We will be constructing an 12″ tall, wooden 4×6″ retaining wall outside of units 42-47. The retaining wall will be constructed 18″ from the fence line and the grade will be raised in this area to redirect water into the swale. The wall will be constructed on road crush. The affected areas will have to be re-sodded.

Unit 42 side area

The grading will have to be raised higher along the foundation of Unit 42. The sump outlet will be directed appropriately and the whole area will be re-sodded.

Unit 149 side area

The grading will have to be raised higher along the foundation of Unit 149. The whole area will be re-sodded after the grading is done.

Unit 140 side area

The grading will have to be raised higher along the foundation of Unit 140. The whole area will be re-sodded after the grading is done.

Unit 69 side area

The grading will have to be raised higher along the foundation of Unit 69. The whole area will be re-sodded after the grading is done.

Unit 105 beside driveway.

A new swale will be created beside Unit 105’s driveway. The grading along the foundation will have to be raised, the whole area re-sodded after the grading work. The sump pump outlet will be directed appropriately away from the unit.